Skip to content

Meta: burn down all open fbuild issues one by one (#962 → #959 → #722, then #527, then #574) #1007

Description

@zackees

Meta / tracking issue: burn down all open fbuild issues, one at a time

This is a sequencing/tracking issue for the 5 currently-open issues on FastLED/fbuild. Each is worked and merged one by one in the order below. The order is chosen by dependency first, then user-facing impact, then scope (smallest self-contained work before the large architectural refactor). Check each box as its PR merges; this meta auto-closes when all are CLOSED.

Snapshot taken 2026-07-08. Open issues: #962, #959, #722, #527, #574.


Phase 1 — USB VID/PID resolution cluster

These three share one subsystem (fbuild-core::usb resolver + the online-data VID/PID pipeline) and should land together, smallest/most-acute first so each builds on the last.


Phase 2 — CI cache


Phase 3 — Architecture (largest refactor, do last)


Working rules for each item

  1. Confirm the issue is still open and re-read its body (bodies drift).
  2. Plan non-trivial work in the issue thread first (per repo CLAUDE.md).
  3. One PR per issue, conventional-commit title, TDD (red → green → refactor).
  4. soldr cargo for Rust, uv run for Python — never bare cargo/python.
  5. Merge, tick the box here, move to the next. Do not parallelize across phases.

Dependency summary

#962 ──▶ #959 ──▶ #722 (rollup of #723–#740)   [USB cluster, sequential]
#527                                            [independent, after cluster]
#574                                            [independent, last]

🤖 Filed via Claude Code — meta tracking issue for the open-issue burn-down.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    Status
    Triage

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions