Summary

  • Tiered shell gates from kernel through RC with Makefile targets and GitHub workflows
  • Production-readiness docs, nexo-ready-gate, and kernel phase resolution tests
  • RC gate: release bundle evidence, GitHub workflow verification, policy tier E scaffold

Test plan

  • make rc-gate-full with RC_GATE_GH_ADVISORY_ONLY=1 locally
  • make nexo-ready-gate with NEXO_READY_SKIP_DOCKER=1
  • Verify rc-gate workflow runs on push

Stacked: PR #2 targets this branch for waterproofing gates.

Made with Cursor

Automates the waterproofing stack with tiered shell gates, Makefile targets,
GitHub workflows, and production-readiness docs so release evidence can run
locally and in CI before tagging.

Co-authored-by: Cursor <cursoragent@cursor.com>
9.0.0 SDK installers are no longer on the CDN; pin 9.0.100 with
latestFeature roll-forward so gate workflows and dotnet CLI resolve.

Co-authored-by: Cursor <cursoragent@cursor.com>
@IanFrelinger
IanFrelinger merged commit 0ecb5bf into master May 22, 2026
12 of 26 checks passed
IanFrelinger pushed a commit that referenced this pull request Sep 30, 2026
…r it

The Readiness-v1 sheets (dated 2026-05-19) and ReleaseSignOff-v1 (bec2a6e,
2026-05-22) mark tiers PASS. An audit claimed several of those PASSes rested on
nothing. This change checks each one against its OWN date and SHA, not against
today. A filter that broke in June does not falsify a PASS recorded in May.

Each PASS row, and each tick in the release sign-off, now carries a dated
"[corrected 2026-09-30: ...]" note in place, with one of four labels:
SUPPORTED (with the run id), UNSUPPORTED-AT-THE-TIME, LATER-DECAYED (with date
and cause), or UNEVIDENCED (a local run nobody can now inspect, not
disproven). Nothing is removed or re-ticked: a word diff against 876cc52
shows only insertions in all 9 files. The production-readiness README and each
corrected sheet state the rule from now on. A PASS names a run on the header
SHA; otherwise the row reads NOT RUN or CARRIED FORWARD with both SHAs. A
readiness PASS cites a Readiness summary run whose verdict is `verified`.

The labels follow that rule. A run on any commit other than the sheet's is
"carried forward tested -> sheet", even when the trees are identical (a PR
head and its merge), and the note names the tree hash or says what differs.
A run that finished after the release sign-off says "after sign-off".

What the evidence shows:
- No commit held these gates on 2026-05-19. The scripts first appear in
  43d5fca (authored 2026-05-22 00:45 UTC), and 7457e6c's Makefile has none of
  the targets. The sheets were committed in 0ecb5bf, whose tree f1e22df
  equals PR #110's head ee8befa.
- SUPPORTED on 0ecb5bf itself: kernel A (26262716833). Carried forward
  ee8befa -> 0ecb5bf (identical tree f1e22df): application A (26262666898),
  composition A-C (26262666838; static counts reproduce the sheet's 44/6/18
  exactly), security A-B (26262666843), and the portal and agent-server dry
  runs (26262666791). Carried forward 7457e6c -> 0ecb5bf (2026-05-19):
  kernel B and ship A (26129468793), mesh-lab-e2e and composition D
  (26129468841), and kernel C's gRPC leg and D's pack-list check.
- UNSUPPORTED-AT-THE-TIME: security C's unit step and 3 of the 4 suites named
  by application B are UnitTestBase suites that FullyQualifiedName~ cannot
  select. CI run 31982500018 prints "No test matches ... TrustCommandTests"
  and then PASS. ReleaseSignOff's "all automated gates green for target SHA":
  8 of the 19 runs on bec2a6e failed, including Full Platform Readiness Gate
  and its Readiness summary. When the box was ticked, none had succeeded and 4
  had already shown a failure (mapbox-tile-helpers-ci 26262737725 and
  onboarding-quickstart-gate 26262737929 at creation, then Cross-Platform
  Tests and Persistence Tests jobs at 01:36).
- LATER-DECAYED: security B since e6b5579 (2026-08-17); application C since
  9579c81 and e6b5579; compat A's migration step since 678d071 (2026-06-08).
  CI logs and a container run at 876cc52 show each one printing "No test
  matches" and then PASS.
- Release sign-off, all after the 01:38:36 sign-off commit: security Tiers
  A-B carried forward 2a1b4d1 -> bec2a6e (PR #114 head, identical tree
  b2996d4, run 26262735412, done 01:57:29); compat 26262738367 (01:56:14);
  DR Tiers A-B 26262738375 (01:50:21). waterproofing-gate.yml has never run
  (API total_count 0). dr-gate's own tier C took its placeholder path in CI,
  but "mesh director persistence verified" is SUPPORTED after sign-off by
  Mesh virtual lab gate run 26262738372 on bec2a6e, which runs the same
  persistence script with the key and LiteDb provider it needs.
- The Operations tick ("rollback drill recorded"): the drill record exists,
  filled in by the sign-off commit fb54476. Its checks passed CI only after
  sign-off. It records a restore in place ("To version: N/A"), not a rollback
  to an earlier version, and its reports went to gitignored .nexo/. The mesh
  task id it cites (20260522001559314-...) is NOT a timestamp of the drill:
  the persistence script always posts idempotency key mesh-lab-persist-idem,
  POST /api/mesh/tasks returns the existing task for a known key, and the
  task lives on a named volume that mesh-lab-up and dr-gate-tier-c never
  remove. The id dates the first seeding of that task (00:15:59 UTC, before
  bec2a6e existed), so it cannot show which tree the local drill ran on.

What this does NOT fix: the gates themselves. Security B, application C and
compat A still print PASS on zero tests, because nothing in those scripts
rejects a filter that matches nothing. The new evidence rule is prose only:
no check reads these tables, so a wrong run id in a note stays green, and
scripts/rc-gate-tier-e.sh (run by waterproofing-gate) still reports
"sign-off: checked items found" from the ticked lines, including the
Engineering tick now annotated UNSUPPORTED-AT-THE-TIME; the README says so.
RollbackDrill-v1.md's own "Result PASS" is not annotated; the note sits on
the sign-off tick that links to it. May test counts cannot be recovered (logs
return HTTP 410); counts given are static counts at the historical SHA,
checked against 2026-08-17 CI logs. CompatReadiness, DRReadiness and
PerfReadiness have no PASS rows and are unchanged.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant