Skip to content

PRD: close Phase P5 (phase log, four follow-ups, the P1 waiver) - #57

Merged
compgeniuses merged 1 commit into
consolidationfrom
prd/P5-exit
Oct 27, 2026
Merged

compgeniuses merged 1 commit into
consolidationfrom
prd/P5-exit

Conversation

@compgeniuses

Copy link
Copy Markdown
Contributor

Closes Phase P5. Documentation and ledger only: no source change.

  • workflow-log/P5-phase-complete-2026-10-27.md — the exit criteria with command evidence, the probe report, the deferred items that need people, and the four follow-ups the phase opened.
  • P1 waiver, stated in full in the log: the phase gate passes G1–G8, the production build and the school-ops probe (15/16, floor 14). P1 (the full suite) failed locally on Windows with six files against a baseline of four: four are platform-only (eslint-gate, secret-scan, fix-encoding, crawlCrashPages) and two are load flakes that pass alone (mockPathsRetired, collectionRegistry). CI runs the same full suite on Linux and fails on anything outside knownFailingFiles; that step passed on PRs UI: module dashboards at the module root, and the school name goes home #54, Settings: an overview and three hubs, one home per feature #55 and PRD P5-W3: Ghana, South Africa and Francophone packs (P5 complete, 13/13) #56.
  • The baseline was not tightened: the only locally better number (typecheck 2252 vs 2500) is platform-dependent by the baseline's own note, and tightening P1 from a failed measurement would loosen it.
  • Four follow-ups opened and deferred out of P5's exit bar: P5-Q01 (make the gate's Windows-only suites skippable so P1 is measurable locally), P5-Q02 (Ghana BECE aggregate emits points, not the aggregate), P5-Q03 (Francophone progression vs circular 268; SN term window), P5-Q04 (wire packs into HR and reports).
  • Ledger: P5 complete 2026-10-27, 13/13 done, 4 deferred; PROGRESS and the wave map regenerated; the handoff opens with the P5 state and the waiver.

Still needs people, as the log lists: native-speaker review of every locale, the payroll accountant's sign-off on the Kenya pack, country-pack stewards, the public application wizard's step 1, and the Ethiopian-calendar default.

…iver [P5]

Exit criteria 1-4 are met with command evidence in the log: four locales complete for the core namespaces, the Ethiopian calendar in
the date fields, 275/275 pack vectors, ten country packs and the Kenya payroll pack. The phase gate passes G1-G8, the production
build and the probe (15/16). P1, the full suite, failed locally on Windows (6 files vs a baseline of 4; four platform-only, two load
flakes) and is waived in favour of CI, whose full-suite step passed on PRs #54, #55 and #56; the baseline was not tightened, because
the only locally better number is platform-dependent.

P5-Q01 to P5-Q04 are opened for what the phase exit left behind and deferred out of P5's exit bar.
@compgeniuses
compgeniuses merged commit d4ad94b into consolidation Oct 27, 2026
4 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant