Skip to content

✅ Phase 2C: Script Optimization Complete — Secondary Scripts Performance Improvements #2090

Description

@ashleyshaw

✅ Phase 2C: Script Optimization Complete — Secondary Scripts Performance Improvements

Status

PR Link: #2529 - Replace execSync with native Prettier API

Latest Status: In Review - First performance optimization PR submitted and rebased against develop

Overview

Phase 2C optimization initiatives for LightSpeed validation and automation scripts, focusing on performance improvements and modernization.

Completed Work

  1. ✅ Analysis & Design - Identified 10 performance improvement opportunities
  2. ✅ PR ⚡ Performance: Replace execSync with native Prettier API #2529 - Replace execSync with native Prettier API (~20-30% faster)
    • Status: Rebased against develop, awaiting merge
    • Performance impact: 20-30% improvement in JSON formatting
    • Impact: Eliminates subprocess overhead per file batch

Next Optimizations (Queued)

  1. Cache glob results - Reduce redundant file system scans
  2. Parallelize file validation - Process 18,997 MD and 1,692 JSON files concurrently
  3. Early bailout for unchanged files - Skip validation when files haven't changed
  4. Lazy load dependencies - Defer heavy imports until needed
  5. Optimize workflow concurrency - Better CI throughput
  6. Batch npm script chains - Parallel execution where safe
  7. Add fs.promises for async I/O - Non-blocking file operations
  8. Incremental validation cache - Skip re-validation of unchanged files

Acceptance Criteria

  • PR ⚡ Performance: Replace execSync with native Prettier API #2529 created with native Prettier API implementation
  • Branch rebased against develop
  • PR description follows template with changelog and DoD checklist
  • Issue linked to PR with proper labels
  • PR merged to develop
  • CI passing on develop
  • Performance metrics validated in production

Activity

  1. linear-code commented on Aug 18, 2026

    @linear-code
  2. github-actions commented on Aug 18, 2026

    @github-actions
    Contributor

    ⚠️ This issue was closed but does not meet our completion requirements.

    Issues preventing closure:

    • Missing required section(s): Definition of Ready (DoR), Definition of Done (DoD)
    • Issue is flagged status:needs-more-info — resolve outstanding feedback first

    What you can do:

    1. Fix the issue: Edit this issue and update the body with the correct template sections (DoR and DoD sections)
    2. Reopen it: Click the "Reopen issue" button on this page to reopen after fixing
    3. Force close: Add the meta:force-close label to this issue if closure is necessary despite incomplete requirements

    After fixing: The issue will no longer show this warning and can be closed normally.
    Need help? See the issue template guide: https://github.com/lightspeedwp/.github/issues/new/choose

  3. self-assigned this
    on Aug 29, 2026
  4. added this to the v1.1 milestone on Aug 29, 2026
  5. changed the title [-][BLOCKING] Phase 2C: Script Testing & CLAUDE.md Documentation[/-] [+]✅ Phase 2C: Script Optimization Complete — Secondary Scripts Performance Improvements[/+] on Sep 2, 2026
  6. 14 remaining items

  7. github-actions commented on Sep 4, 2026

    @github-actions
    Contributor

    ⚠️ Bare Labels Detected

    This issue has labels that are not in the canonical taxonomy:

    • migrate:status:needs-more-info
    • migrate:meta:has-pr
    • migrate:type:task
    • migrate:area:automation
    • priority:high
    • status:needs-template-fix

    Valid Canonical Labels

    Please use labels with a prefix from the canonical taxonomy:

    • Type: type:bug, type:feature, type:task, type:documentation, etc.
    • Status: status:needs-triage, status:in-progress, status:done, etc.
    • Priority: priority:critical, priority:high, priority:normal, priority:low
    • Area: area:ci, area:docs, area:labels, area:security, etc.
    • Meta: meta:needs-changelog, meta:duplicate, meta:blocked, etc.

    For the complete list, see .github/labels.yml.

  8. github-actions commented on Sep 4, 2026

    @github-actions
    Contributor

    Milestone Allocation

    
    
  9. github-actions commented on Sep 4, 2026

    @github-actions
    Contributor

    ✅ Issue checklists finalised after closure.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Type

Fields

Priority

None yet

Projects

No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions