Skip to content

release prep: plugin catalog pins, RT-218 tool bumps, pipefail guards - #425

Merged
m4ttheweric merged 3 commits into
mainfrom
release-next
Sep 24, 2026
Merged

m4ttheweric merged 3 commits into
mainfrom
release-next

Conversation

@m4ttheweric

@m4ttheweric m4ttheweric commented Sep 24, 2026 •

Copy link
Copy Markdown
Collaborator

Release-day pins for the next rt tag (rt:release step 2c). Must merge before the notes commit.

Plugin catalog

  • mattstack 7441e73 (0.17.18) to 5b472b7 (0.20.0: pack authoring, SKILLS-76, writing-style presets)
  • fast-browser d386ae9 to 778b582 (0.1.5, matches the deps.lock pin)

Tools (RT-218)

  • age and age-keygen 1.3.1 to 1.3.2
  • gh 2.98.0 to 2.101.0
  • glab 1.114.0 to 1.119.0
  • node 24.19.0 to 24.21.0
  • cloudflared 2026.8.3 to 2026.9.3

Every sha256 was computed from the download and matches the upstream-published checksum (GitHub asset digest, checksums.txt, or SHASUMS256.txt); every extract path still exists in the new archive. Sparkle 2.10.0 is held for its own release.

Pipefail guards

  • walkthrough.sh, xcuitest.sh, build-golden.sh (golden-image guards) and marketplace.sh (staged-symlink guard) use grep -c ... >/dev/null instead of grep -q
  • under set -o pipefail, grep -q exits on its first match and the producer's SIGPIPE turns the pipeline into 141, so the guard reads a present match as absent; the symlink guard failed open that way
  • proven with a 200k-line producer (grep -q 141, grep -c 0 on a hit, 1 on a miss); marketplace.sh --dry-run still validates

deps.lock tests: 107 pass across 8 files.

🤖 Generated with Claude Code

m4ttheweric and others added 2 commits September 24, 2026 16:30
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
…oudflared 2026.9.3 (RT-218)

Each sha256 matches the upstream-published checksum and every extract path
is unchanged. Sparkle 2.10.0 stays for its own release.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
@coderabbitai

coderabbitai Bot commented Sep 24, 2026 •

Copy link
Copy Markdown

Warning

Review limit reached

Next included review available in 36 minutes.

Check out review usage here.

View limit details

Limit details: You’ve used the included review currently available. Your 83 included PR review attempts over the past 7 days set your current allowance at 1 review per hour.

Your organization has reached its usage spending cap. Adjust your spending cap in the billing tab.

Learn how review limits work.

Review configuration:

⚙️ Run configuration

Configuration used: defaults

Review profile: CHILL

Plan: Advanced

Run ID: fc482905-7cdb-4905-9549-d9b07934cff2

📥 Commits

Reviewing files that changed from the base of the PR and between 3388c7a and 37af84d.

⛔ Files ignored due to path filters (1)
  • rt-tray/deps.lock is excluded by !**/*.lock
📒 Files selected for processing (5)
  • marketplace/marketplace.json
  • rt-tray/vm/golden/build-golden.sh
  • rt-tray/vm/run/walkthrough.sh
  • rt-tray/vm/run/xcuitest.sh
  • scripts/release/marketplace.sh

Comment @coderabbitai help to get the list of available commands.

grep -q exits on its first match, so a producer still writing takes
SIGPIPE and pipefail reports 141: the guard reads the match as absent.
The marketplace symlink guard failed open that way; the golden-image
guards failed closed. grep -c reads to the end.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
@m4ttheweric m4ttheweric changed the title release prep: plugin catalog pins + RT-218 tool bumps release prep: plugin catalog pins, RT-218 tool bumps, pipefail guards Sep 24, 2026
@m4ttheweric
m4ttheweric merged commit b72b7ef into main Sep 24, 2026
6 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant