Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
194 changes: 187 additions & 7 deletions docs/core-reset/removal-manifest.yml

Large diffs are not rendered by default.

26 changes: 15 additions & 11 deletions docs/core-reset/scorecard.md

Large diffs are not rendered by default.

28 changes: 17 additions & 11 deletions docs/designs/2026-07-19-core-reset.md

Large diffs are not rendered by default.

25 changes: 14 additions & 11 deletions docs/roadmap.md
Original file line number Diff line number Diff line change
Expand Up @@ -11,7 +11,7 @@ Madar is executing an accepted Core Reset. The roadmap is outcome-driven: work a
- [Removal manifest](core-reset/removal-manifest.yml) — keep, rebuild, move, delete, and defer decisions
- [Scorecard](core-reset/scorecard.md) — technical and business evidence gates

The RFC is **accepted**. Scope and baseline, Directed multigraph, Canonical TypeScript/JavaScript index, the combined legacy/non-code deletion, Generation and reconciliation, Evidence-path query, Thin Delivery, and Evaluation Tooling Isolation have passed. Capability Validation is the sole active technical phase under the exact first-stage owner-approved #610 proposal; its activation merge, implementation, and campaign remain separately gated.
The RFC is **accepted**. Scope and baseline, Directed multigraph, Canonical TypeScript/JavaScript index, the combined legacy/non-code deletion, Generation and reconciliation, Evidence-path query, Thin Delivery, and Evaluation Tooling Isolation have passed. Capability Validation v1 is stopped under #610; `capability-validation-v2` is the sole active technical phase under the exact first-stage owner-approved #612 proposal, while activation merge, offline implementation, provider-account observation, and the fixed campaign remain separately gated.

## Passed — directed multigraph

Expand Down Expand Up @@ -119,23 +119,26 @@ Capability Validation remained blocked throughout #606. The completed phase neit

No #606 stop condition triggered. No npm package, GitHub Release, Registry metadata, or tag was published, and the phase did not target `main`.

## In progress — capability validation
## In progress — capability validation v2

The owner approved proposal-body SHA-256 `27c04eca61e8c3ae65e2a9eab5c0b7e269313be933cef785b94e9bdca7292ba5` through the durable [#610 first-stage receipt](https://github.com/mohanagy/madar/issues/610#issuecomment-5081132612) and [matching RFC receipt](https://github.com/mohanagy/madar/issues/577#issuecomment-5081133199). Governance activation starts from protected `core-reset` commit `e7b3be547bc3f6cfdefdd514f17a1ad229afea03`, tree `0fb5664ab85ecb04275f6277ee65270b948f8ab3`, and audited `src` tree `1a37e3a58ee7b2a75ca034112506590f699b3918`.
Capability Validation v1 stopped before an implementation PR, campaign lock, or provider request when independent review triggered #610 stop conditions 7, 8, and 13. Its original protected base `e7b3be547bc3f6cfdefdd514f17a1ad229afea03`, proposal SHA-256 `27c04eca61e8c3ae65e2a9eab5c0b7e269313be933cef785b94e9bdca7292ba5`, [#610 approval](https://github.com/mohanagy/madar/issues/610#issuecomment-5081132612), and [RFC approval](https://github.com/mohanagy/madar/issues/577#issuecomment-5081133199) remain historical. The immutable [#610 stop receipt](https://github.com/mohanagy/madar/issues/610#issuecomment-5083281270) and [RFC stop amendment](https://github.com/mohanagy/madar/issues/577#issuecomment-5083282711) preserve activation head `80e942a8a28e3895465aa9ca432c4a926054055d`, merge `dcb52596a3efa89f9ef5d372231ce97a91ae5f9f`, tree `d0ca317290dbd6837295f36f36ded5b49855c0fe`, and the three v1 asset bytes. No Count Tokens, Create, other provider request, campaign spend, implementation PR, production change, or publication occurred.

The activation adds only the versioned companion `tools/eval/core-reset/contracts/capability-validation-v1.json` and its contract and receipt schemas, while modifying only the five governing files. It changes no production code, executable evaluator, dependency, package/build configuration, CI workflow, historical contract, or receipt. Before activation may merge, a second owner receipt must bind the exact unchanged activation head, all three asset SHA-256 values, and every new JSON-pointer, raw-tool, receipt, dossier, mapping, error, and operational/schema choice.
The owner approved exact v2 proposal-body SHA-256 `4906405cbb806c850c0612305ef460e023e2060b5338734ae0af12303901cbd0` through the durable [#612 first-stage receipt](https://github.com/mohanagy/madar/issues/612#issuecomment-5083661878) and [matching RFC receipt](https://github.com/mohanagy/madar/issues/577#issuecomment-5083662827). Governance activation starts from protected `core-reset` commit `dcb52596a3efa89f9ef5d372231ce97a91ae5f9f`, tree `d0ca317290dbd6837295f36f36ded5b49855c0fe`, audited `src` tree `1a37e3a58ee7b2a75ca034112506590f699b3918`, and `tools/eval` tree `b8ef02da3ce135596e87fdf6252441755061d956`.

After that exact activation merge, implementation is limited to the 29 paths and line budgets in #610. It must preserve 43 production TypeScript files / 11,956 LOC, the `src` tree, package and lock bytes, graph/index/query semantics, public budgets and timeouts, the 102-file npm artifact boundary, and every frozen v2 grading input. No compatibility alias, dependency, production edit, generated commit, historical rewrite, or `main` target is permitted.
The governance-only candidate adds exactly `capability-validation-v2.json`, `capability-validation-contract-v2.schema.json`, and `capability-validation-receipt-v2.schema.json` and modifies only the five governing files, within `+3,850/-250`. It changes no production code, executable evaluator, CI, dependency, package/build configuration, historical contract, or receipt. Before activation may merge, a second owner receipt must bind the exact unchanged head, all three asset SHA-256 values, and every newly exact coordinator, relay, evidence, containment, ledger, receipt, stopped-finalization, archive, public-validation, error, path, LOC, schema, and operational choice.

The fixed campaign is exactly 60 paid answer trials across Native, Graphify cold/warm, and Madar cold/warm, plus one separate Madar-only diagnostic, using first-party Anthropic Messages API model `claude-sonnet-4-6`, temperatures `0` and `0.7`, at most 12 tool calls and 13 create requests per trial, and the frozen 300-second boundary. Provider input is capped at 20,000,000 tokens, output at 2,000,000, the runner ledger at USD $90, and the provider-enforced workspace/key cap at USD $100.
Only after that exact activation merge may offline implementation start, limited to #612's 53 exact paths and `+29,130/-350`; combined activation plus implementation remains `+32,980/-600`. This supersedes only v1's 29-path / `+12,200/-200` development boundary. The provider, token, USD, trial, matrix, timeout, tool-call, product, production, package, dependency, graph/index/generation/query, and public-semantic ceilings remain unchanged; no compatibility alias, dependency, production edit, generated commit, historical rewrite, or `main` target is permitted.

No provider request of any kind—including Count Tokens—is authorized until the exact implementation merge is locked with the machine, toolchain, request, environment, schedule, spend, isolation, mapping-custodian, reviewer, and adjudicator receipts required by #610. The campaign runs once with no retry, replacement, repair, dropped row, post-reveal regrade, or budget widening. Any stop condition requires an RFC #577 amendment before further technical work.
After the exact offline implementation merge, one separately reviewed governance-only closure may modify only these five governance files within `+400/-200`, for full activation-plus-implementation-plus-closure ceilings of `+33,380/-800`. It may record only that the v2 offline execution boundary passed, exact merge/review/CI evidence, v1's unchanged stop, the unresolved provider observer, zero requests/spend, and no active campaign.

With Capability Validation active, the remaining dependency order is:
The offline v2 boundary cannot create a real campaign lock: authenticated provider-account hard-cap and zero-use observation remains a separately proposed future mechanism. No provider request of any kind—including Count Tokens or Create—target-repository execution, paid spend, or fixed campaign is authorized by this activation. Any stop condition requires an RFC #577 amendment before further technical work.

1. Complete the exact #610 activation, implementation, one fixed campaign, sealed review, and receipt gates.
2. Run external design-partner validation.
3. Publish a beta under npm tag `next` only after its preceding gates authorize it.
The remaining dependency order is:

1. Complete exact #612 governance activation and separately authorized offline implementation.
2. Approve and prove the provider-account observer, then separately lock and run the unchanged fixed campaign.
3. Run external design-partner validation.
4. Publish a beta under npm tag `next` only after its preceding gates authorize it.

Every replacement issue has an exact deletion contract. New and old implementations may coexist only temporarily on the reset integration branch; the old path cannot survive the phase.

Expand Down
Loading
Loading