Skip to content

Initial e2e tests - #45

Merged
openshift-merge-robot merged 2 commits into
openshift:masterfrom
slaskawi:e2e-tests
Feb 16, 2022
Merged

openshift-merge-robot merged 2 commits into
openshift:masterfrom
slaskawi:e2e-tests

Conversation

@slaskawi

@slaskawi slaskawi commented Feb 11, 2022 •

Copy link
Copy Markdown

This Pull Request makes test-e2e target passing, which is required (or at least recommended) to get openshift/release#26287 in.

@openshift-ci openshift-ci Bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Feb 11, 2022
@openshift-ci
openshift-ci Bot requested review from deads2k and sttts February 11, 2022 13:45
@openshift-ci openshift-ci Bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Feb 11, 2022
@slaskawi slaskawi changed the title [WIP] e2e tests Initial e2e tests Feb 16, 2022
@openshift-ci openshift-ci Bot removed the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Feb 16, 2022
@openshift-ci

openshift-ci Bot commented Feb 16, 2022

Copy link
Copy Markdown
Contributor

@slaskawi: all tests passed!

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository. I understand the commands that are listed here.

@s-urbaniak

Copy link
Copy Markdown
Contributor

/lgtm

@openshift-ci

openshift-ci Bot commented Feb 16, 2022

Copy link
Copy Markdown
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: s-urbaniak, slaskawi

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:
  • OWNERS [s-urbaniak,slaskawi]

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci Bot added the lgtm Indicates that a PR is ready to be merged. label Feb 16, 2022
@openshift-merge-robot
openshift-merge-robot merged commit 411bef6 into openshift:master Feb 16, 2022
sakshiep1 added a commit to sakshiep1/cert-manager-operator that referenced this pull request Aug 10, 2026
- CVE-2026-33186: replace grpc => openshift-sustaining/grpc-go@v1.75.1-sec.1
- CVE-2026-39821 + CVE-2026-25681: replace net => openshift-sustaining/net@v0.50.0-sec.2
- CVE-2026-46597: replace crypto => openshift-sustaining/crypto@v0.48.0-sec.1
Depends on openshift/jetstack-cert-manager#45 for operand image rebuild.
Jetstack replace will be updated after openshift#45 merges.
Jira: CM-1222
Signed-off-by: Sakshi Patidar <spatidar@redhat.com>
sakshiep1 added a commit to sakshiep1/cert-manager-operator that referenced this pull request Aug 24, 2026
Updates openshift/jetstack-cert-manager replace to merge commit of openshift#45
(a9537101948b58e4c5e644916f65ffcbd9d86e49).

Also updates operand.Dockerfile RELEASE_BRANCH to release-1.17 so
operand images build with CVE fixes.

Depends on: openshift/jetstack-cert-manager#45 (merged)

Jira: CM-1222
Signed-off-by: Sakshi Patidar <spatidar@redhat.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants