Skip to content

Upstream integration cycle: pull request row presentation, loading layout stability, and hover previews #700

Closed

Description

@rynfar

Tracking issue for Batch 5 of upstream integration cycle up to HEAD (2efb8178d8).

Targeted upstream commits

  1. 9f0c9f725d (#12545): fix(web): reuse current PR status in the sidebar
  2. 6a699f0f2f (#12721): fix(web): stabilize pull request loading layout
  3. 9334924700 (#12719): fix(web): pull request chips share the link hover preview
  4. 411da2a735 (#12536): feat(web): use the linked pull request row layout on the pull requests page

Adversarial review invariants

  • Respect Pylon's multi-PR tracking and quota reservation models
  • Preserve Pylon branding and responsive layout authority
  • Typechecks and unit tests with 0 errors

Activity

  1. added a commit that references this issue on Sep 21, 2026
    37cf559
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions