Owner-reported operating context — 12 November 2026 (Asia/Bangkok)
Ash reports that protected files and branch protection have been removed, main is now the default branch, and work is taking place directly on main. These are owner-reported changes, not independently verified repository or settings evidence. The exact removed-file inventory remains unspecified.
Include this reported operating-context change within the existing planning-reconciliation outcome. Historical develop evidence and proposed documentation branches below are not current execution instructions. Reconcile affected branch and protection statements without deleting history, marking tasks complete, restoring retired controls or expanding the bounded file plan.
This notice leaves the original description below, acceptance criteria, checklist states and all native properties unchanged. It authorises no repository operations, direct commits, settings changes, implementation, reopening, closure or acceptance. Independent approval requirements remain applicable.
Current evidence and branch handoff — 25 October 2026
Recorded status: Backlog; whole-child acceptance remains outstanding. This refresh supersedes stale baseline and implementation-position claims below, without removing the original outcome or acceptance criteria.
The merged consistency report and coverage matrix have changed since the 24 October audit. The report now corrects the total to 68 in some sections but still claims 69 elsewhere; the matrix still claims 69. Both retain unsupported whole-workstream verification claims. The report still says the supplementary plan was not found. Current tasks.md has 68 checklist entries with 68 unique task identifiers; phases/phase-2-governance-consolidation.md has 40 unique task identifiers across 49 checkbox rows. Do not confuse task identifiers with every checkbox row or infer approval of the 33→34 requirement difference from counting.
Retain the existing documentation-only reconciliation outcome. Reconcile changed report/matrix content, the actual supplementary source, current child ownership, T018–T024, approval provenance and revision-specific verification. Existing implementation and human decisions remain evidence to preserve, not authority to complete other workstreams.
Bounded proposed file plan
- Edit
reports/repo-governance/2026-10-22-spec-001-consistency-review.md: reconcile internal counts, supplementary-source discovery and unsupported completion/verification claims. - Edit
.github/specs/001-repo-governance-layout-and-agentic-workflows/coverage.md: reconcile identifiers, child ownership and evidence classification; protected planning review required. - Edit
prompts/repo-governance/spec-001-continuation.md: update only evidenced handoff inconsistencies; no nested task execution. - Conditional edits to
tasks.mdandphases/phase-2-governance-consolidation.mdwithin the same specification directory require exact Markdown previews of T018–T024/traceability corrections; preserve identifiers and history. No other specification paths are implicitly included.
Proposed branch: docs/repo-governance-reconcile-evidence, not created or approved for creation; validate against the current validator before requesting implementation approval. Shared documentation PR template applies; verify its current contents and routing rather than copying a local template. Changelog applicability and protected-file gates remain unresolved, not automatically satisfied.
Repository evidence: lightspeedwp/ThisOneTimeOnAcidCom at develop revision f99275b085cffd209b9bd42f6e463c0af643099a. Read AGENTS.md and the repository's own branch-validation instructions before separately authorised implementation; repository instructions take precedence. Refresh the base and overlapping changes before choosing a branch. No existing branch is approved for reuse.
The native parent is a coordination record, not an implementation or closing target. No parent reference in future branch names, PR association fields or closing directives. No closing target is established; verify child acceptance, issue mapping and association effects separately. This description update changes no status, hierarchy, native PR association, repository file, branch, settings or approval boundary. Existing GitHub issue sync may propagate this text externally.
Documentation Update Summary
Reconcile the repository-governance specification with current implementation, approved decisions and existing child-issue scopes. Produce evidence-backed planning improvements and a bounded Claude continuation prompt without duplicating implementation work.
Linked Stories/Tasks/PRs/Epic
Parent epic: #237, coordination only—not a PR development or closing target.
Coordinate with existing routing, migration, configuration, documentation, CI and budget workstreams. Inspect #346 for overlapping work; do not reuse, retarget or amend it automatically.
Milestones & Timeline
No dates or milestones proposed. Reconcile evidence and approval boundaries before authorising implementation.
What documentation is needed?
- Reconcile the 62-task main list and overlapping 40-entry supplementary plan; preserve task identifiers and valid delivered work.
- Incorporate the approved T018–T024 corrections and remove unsupported completion claims.
- Map all 34 requirement identifiers, existing child outcomes, tasks and verification evidence. Reconcile the earlier 33-requirement baseline without silently approving added scope.
- Correct stale constitution, runtime, integration, command, workflow and historical PR claims.
- Distinguish installed behaviour, approved targets, proposed changes and verified results.
- Draft a consistency-review report, a requirement-to-delivery evidence matrix and a Claude continuation prompt.
- Propose targeted Markdown patches to existing specification artefacts, preserving decisions, references and history.
Excluded: routing implementation, migrations, application changes, workflows, protected configuration, spending controls and unrelated record changes.
Why is this documentation important?
Conflicting plans and unsupported completion markers can misdirect implementation, duplicate existing work and prematurely close coordination issues.
Acceptance Criteria
- Documentation is clear, accurate, and up-to-date
- Includes code examples/screenshots if applicable
- Documentation is accessible and easy to find
- Changelog entry prepared for PR if user-facing update
- PR uses correct branch prefix (docs/)
- PR description updated with relevant details
- Changelog entry prepared for PR (if applicable)
- Labels/types match org standards
- Both task plans reconcile into one dependency-aware delivery map without duplicate implementation ownership.
- Approved T018–T024 corrections preserve evidenced sub-items and distinguish incomplete parent outcomes.
- Requirements, tasks, implementing children and named validation evidence are traceable; unresolved mappings remain explicit.
- Installed Gemini commands and Spec Kit behaviour are distinguished from proposed Claude workflows.
- Review report, evidence matrix and continuation-prompt Markdown drafts are complete.
- Existing architectural approvals remain intact; authority conflicts, unapproved budgets and implementation gaps remain explicit.
- PR instructions target this implementing child only; epic completion requires separate approval.
Additional Context
Reference baseline: develop at 4ecdb26d9655a48bf000a7c89da2f70383edce87; recheck before implementation.
Proposed deliverables:
Branch instructions
- Proposed branch:
docs/repo-governance-reconcile-spec-planning - Base: current
develop, rechecked before starting. - Implementing target: this child after creation.
- No epic identifier in branch or PR association fields.
- No closing target until full child-outcome completion and association effects are verified.
- Documentation PR template applies; existing routing/label inconsistencies remain blockers to report, not permission to change automation.
The template’s unconditional changelog checklist conflicts with meta:no-changelog. Confirm applicability before implementation; do not edit protected changelog content or mark the item complete automatically.
Definition of Ready (DoR)
- Documentation need is clear and well-defined
- Related docs/issues or files linked
- Acceptance criteria listed
- Estimate added if relevant
- Milestone/release assigned (if applicable)
Definition of Done (DoD)
- Documentation meets org standards and guidelines
- Changelog entry prepared for PR (CHANGELOG.md)
- Documentation reviewed for clarity and accessibility
- Screenshots/code examples included if relevant
- PR uses correct branch prefix (docs/)
- PR uses the correct PR template based on
type:docsPR label or linked issue type or linked issuetype:docslabel - Branch deleted after merge
- Linked issue(s) updated with latest status and closed after merge,
- The related epic should not be closed, instead updated with a comment to reflect the closed issue
Checklist items describe acceptance gates, not permission to close records automatically.
Unanswered clarification questions
These questions clarify planning reconciliation and traceability; they do not approve added scope or implementation.
- Which differences between the earlier 33-requirement baseline and the recorded 34 identifiers represent approved scope?
- Which existing implementing child owns each unresolved requirement or task, and which mappings remain uncertain?
- What evidence is sufficient to distinguish drafted, implemented-but-unverified and verified delivery?
- Which recorded claims require refreshed evidence from the specification package and overlapping PR automation: repo-governance - Add governance automation and validation #346?
- What changelog applicability and review approval resolve the conflict between the template checklist and meta:no-changelog?